BLD-Final | 12/13/2001 | 12/14/2001 | 12/14/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### c.c # 22020 issued 12/14/2001 10:22:47 AM
|
BLD-Framing/Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 | A | PASS |
Russ Owen
|
|
|
fr doug ###-####
|
BLD-Framing/Rough-in | 9/7/2001 | 9/10/2001 | 9/10/2001 | A | PART |
Jim Storey
|
|
|
###-#### engery ok ok to start northside of house and garage/ cn posted for truss isues 2/ and floor joist pony wall studs/ 9/10/2001 5:54:13 PM
|
BLD-Framing/Rough-in | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Jim Storey
|
|
|
SHEER WALL ###-#### DOUG exterior ok as per approved plan. 9/6/2001 10:59:35 AM
|
BLD-Aging Inspection | 9/4/2001 | 9/4/2001 | 9/4/2001 | | FAIL |
Jim Storey
|
|
|
no call for insp. 9/4/2001 8:30:10 AM
|
BLD-Footing | 7/3/2001 | 7/5/2001 | 7/5/2001 | A | PART |
Tony Young
|
|
|
rebar Jim ###-####
called and already poured, verbal corrections on what to look out for 7/5/2001 1:08:24 PM
|