BLD-Final | 1/31/2002 | 2/1/2002 | 2/1/2002 | A | PASS |
Russ Owen
|
|
|
ED ###-#### > Temporary guardrails,iorn railing to be installed at a latter date.as prior c/n2/1/2002 12:46:01 PM 2/1/2002 12:46:36 PM
|
BLD-Final | 1/30/2002 | 1/31/2002 | 1/31/2002 | P | FAIL |
Tony Young
|
|
|
ED ###-####
need house #s and rail out front, trades ie: plumbing 1/31/2002 2:22:44 PM
|
BLD-Final | 1/30/2002 | 1/31/2002 | 1/31/2002 | A | NR |
Carl Dependahl
|
|
|
ED ###-####
|
BLD-Energy code compliance | 1/25/2002 | 1/28/2002 | 1/28/2002 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted,,, I just noticed that the job desciption did not have the detatched garage listed as scope of work, but is in the approved plans, c/n states to get permit taken care of and also to include finished portion of basement that was to be un-finished///ok to cover garage after BP is recieved. 1/28/2002 11:07:23 AM
|
BLD-Aging Inspection | 1/16/2002 | 1/16/2002 | 1/16/2002 | | PART |
Tony Young
|
|
|
wip 1/16/2002 9:54:30 AM
|
BLD-Energy code compliance | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/8/2001 | 11/9/2001 | 11/9/2001 | A | PASS |
Tony Young
|
|
|
###-#### ED
look for paint marks , straps, shim 11/9/2001 10:04:50 AM
|
BLD-Framing/Rough-in | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | CANC |
Russ Owen
|
|
|
###-#### ED
|
BLD-Framing/Rough-in | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | CANC |
Russ Owen
|
|
|
###-#### ED
|
BLD-Framing/Rough-in | 11/5/2001 | 11/5/2001 | 11/5/2001 | A | PART |
Tony Young
|
|
|
FIREPLACE CONCEALMENT ###-#### ED
wip 11/5/2001 10:25:36 AM
|
BLD-Framing/Rough-in | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PART |
Tony Young
|
|
|
SHEAR ON GARAGE\\###-####
shear on garage pass 10/11/2001 1:11:53 PM
|
BLD-Framing/Rough-in | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PART |
Tony Young
|
|
|
ed ###-#### shear insp
ext. shear ok, (no sticker) 9/20/2001 11:46:06 AM
|
BLD-Foundation | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | PART |
Russ Owen
|
|
|
garage stemwall ###-####. 2-rows of horizontal reinforcement through-out. 9/19/2001 11:36:32 AM
|
BLD-Foundation | 9/17/2001 | 9/18/2001 | 9/18/2001 | P | NR |
Tony Young
|
|
|
###-#### ED
|
BLD-Footing | 9/14/2001 | 9/17/2001 | 9/17/2001 | A | PASS |
Tony Young
|
|
|
ed--###-####--garage ft
|
BLD-Framing/Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | NR |
Dave Hannah
|
|
|
shear wall--ed-- ###-#### still working on nialing panels 9/17/2001 1:35:04 PM
|
BLD-Aging Inspection | 9/5/2001 | 9/5/2001 | 9/5/2001 | | PASS |
Tony Young
|
|
|
wip 9/5/2001 10:36:48 AM
|
BLD-Foundation | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PART |
Tony Young
|
|
|
###-####
pouring, verbal corrections 7/6/2001 11:15:30 AM
|
BLD-Footing | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PART |
Tony Young
|
|
|
###-####
basement ftgs 7/3/2001 9:49:07 AM
|