Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01741
StatusFinaled
Name O'NEILL HOMES LLC
Site Address 3930 S MILL SITE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 1825s.f. 2-story single family dwelling. ther is 1475s.f. on the main level and 350s.f. on the upper level. there is an attached 474s.f. 2-car garage. R-1C/DA setbacks ok per ajb. all per the approved engineered plans as noted and attached conditions list. PC#0471 pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/6/200112/7/200112/7/2001APASS
DetailsSteven Webb
joe ###-#### c. of c. #20958 issued. 12/7/2001 9:12:40 AM
BLD-Final12/4/200112/4/200112/4/2001PFAIL
DetailsSteven Webb
fn joe- ###-#### c/n issued--handrail needed at stairs, insulation/visqueen and debris removal in crawl. 12/4/2001 1:32:27 PM
BLD-Aging Inspection11/28/200111/28/200111/28/2001 PART
DetailsSteven Webb
wip 11/28/2001 9:40:44 AM
BLD-Framing/Rough-in9/25/20019/26/20019/26/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 09/25/2001 at 14:01:04. Contact: .ok to sheetrock. 9/26/2001 11:40:10 AM
BLD-Energy code compliance9/20/20019/21/20019/21/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/20/2001 at 14:44:09. Contact: . Not completed--do not cover 9/21/2001 2:16:08 PM
BLD-Framing/Rough-in9/18/20019/19/20019/19/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/18/2001 at 16:40:10. Contact: . c/n issued--ok to insulate 9/19/2001 10:20:25 AM
BLD-Framing/Rough-in9/18/20019/18/20019/18/2001PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/18/2001 at 09:54:14. Contact: ###-####. no truss engineering on site no framing insection prefomed 9/18/2001 2:00:07 PM
BLD-Wall cover8/31/20019/4/20019/4/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 08/31/2001 at 16:26:27. Contact: . all c/n items have been completed 9/4/2001 9:10:52 AM
BLD-Wall cover8/30/20018/31/20018/31/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/30/2001 at 16:08:11. Contact: . C/N posted-on to side except main floor front and patio area where window is not per plans. 8/31/2001 10:13:36 AM
BLD-Wall cover8/29/20018/30/20018/30/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/29/2001 at 16:17:36. Contact: . Not ready--Approved plans with conditions/permit not on site. 8/30/2001 1:36:55 PM
BLD-Wall cover8/28/20018/29/20018/29/2001ANR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/28/2001 at 11:32:32. Contact: . Talked to builder--will re-call 8/29/2001 9:47:00 AM
BLD-Foundation7/20/20017/20/20017/20/2001PPART
DetailsSteven Webb
###-#### wip 7/20/2001 12:41:25 PM
BLD-Footing7/19/20017/19/20017/19/2001PPART
DetailsSteven Webb
James ###-#### wip 7/19/2001 12:24:37 PM