BLD-Final | 12/28/2001 | 12/31/2001 | 12/31/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####, l/c issued 12/31/2001 10:14:28 AM
|
BLD-Conference | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | PART |
Tony Young
|
|
|
###-#### tim
on final 12/28/2001 11:38:50 AM
|
BLD-Final | 12/27/2001 | 12/28/2001 | 12/28/2001 | P | NR |
Tony Young
|
|
|
###-####
|
BLD-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/29/2001 | | NR |
Carl Dependahl
|
|
|
sfd, wip 11/29/2001 2:59:59 PM
|
BLD-Energy code compliance | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/24/2001 6:00:19 PM ok to cover
|
BLD-Framing/Rough-in | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | PART |
Carl Dependahl
|
|
|
Tim, ###-#### chk vapor barrier 9/24/2001 5:57:48 PM t final below stairs 9/24/2001 5:58:32 PM
|
BLD-Framing/Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 14:06:06. Contact: ###-####.c/n need hd's,straps installed eng'r to report on truss brg & "fix",& anchor bolts at shearw alls at existing. ok to insul.
, 9/12/2001 11:05:41 AM
|
BLD-Framing/Rough-in | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | PART |
Tony Young
|
|
|
sheer wall ###-#### tim
ext. nailing ok w/ verbal corrections to Tim, need to verify hd's and mst straps at frame inspection 8/28/2001 12:13:24 PM
|
BLD-Footing | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### porch & isolated ftgs 7/9/2001 4:14:44 PM
|