BLD-Final | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | DONE |
|
|
|
Final ok/perm. occ.
|
Permanent Occupancy | | 6/18/2002 | 6/18/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | 5/1/2002 | 5/1/2002 | 4/29/2002 | A | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF 5/1/2002 9:15:01 AM
|
BLD-Final | 12/28/2001 | 12/28/2001 | 12/28/2001 | P | PART |
Russ Owen
|
|
|
Ok temporary oc,needs all other signatures on card for a perm occupancy. Note ther are 3 permits for this job carwash,building/store and one for the fuel island. 12/28/2001 3:14:49 PM
|
BLD-Final | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | NR |
Russ Owen
|
|
|
###-####
|
FIRE-Final Inspection | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety and fire sprinkler finaled 12/20/2001 4:59:05 PM
|
FIRE-Final Inspection | 12/17/2001 | 12/18/2001 | 12/18/2001 | A | FAIL |
Troy Cobbley
|
|
|
remove thumb turn on main exit, remove thumb turn and key set on beer cave doors, install handle on inside of beer cave door, provide exit sign on main door, provide signs on emergency off switch, provide signs on gas pumps, have dave miller inspect fuel tanks, repair duct detectors and install building address 12/18/2001 11:03:00 AM
|
BLD-Framing/Rough-in | 12/7/2001 | 12/10/2001 | 12/10/2001 | A | FAIL |
Russ Owen
|
|
|
JUSTIN ###-#### . ceiling grid. 12/10/2001 10:36:42 AM
|
BLD-Framing/Rough-in | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | FAIL |
Russ Owen
|
|
|
ceiling ###-####. areas under the osb need support. contractor notified. 12/10/2001 2:06:01 PM
|
BLD-Framing/Rough-in | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### JUSTIN CEILING GRID. c/n posted. 12/7/2001 11:02:32 AM
|
BLD-Framing/Rough-in | 10/30/2001 | 10/30/2001 | 10/30/2001 | P | PART |
Russ Owen
|
|
|
###-#### JUSTIN . Ok to raise ceilling in rear hallway, not rated. Owner request.( Note door of cooler may be encroaching into required hallway width told contractor to consult with architect. No c/n at this time. 10/31/2001 9:16:27 AM
|
BLD-Framing/Rough-in | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | PASS |
Russ Owen
|
|
|
fr insp ###-#### justin all ok except complete fireblocking. 10/25/2001 11:09:35 AM
|
BLD-Framing/Rough-in | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PASS |
Russ Owen
|
|
|
###-#### Ok to rock. Will need to recall for 1hr duct enclosures when ready. 10/25/2001 4:44:14 PM
|
BLD-Framing/Rough-in | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PART |
Russ Owen
|
|
|
###-#### JUSTIN. prior c/n ok. need some minor issues addressed went over with contractor. 10/22/2001 4:10:08 PM
|
BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | PART |
Russ Owen
|
|
|
roof nail ###-#### justin. ok roof and ext wall shear.c/n posted on site for other items. 10/9/2001 11:42:34 AM
|
BLD-Foundation | 9/20/2001 | 9/21/2001 | 9/21/2001 | P | PASS |
Tom Arcoraci
|
|
|
fd-- justin ###-#### flat work ok 9/21/2001 3:05:42 PM
|
BLD-Foundation | 9/13/2001 | 9/13/2001 | 9/13/2001 | P | PASS |
Russ Owen
|
|
|
stem wall justin ###-####
|
BLD-Footing | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 11:29:24. Contact: ###-####. bldg and trash incloser ok to pour 9/11/2001 11:28:46 AM
|