BLD-Final | 11/28/2001 | 11/29/2001 | 11/29/2001 | P | PASS |
Steven Webb
|
|
|
###-#### LOCK BOX 193 c. of c. #20948 issued. 11/29/2001 1:34:24 PM
|
BLD-Energy code compliance | 10/1/2001 | 10/2/2001 | 10/2/2001 | A | PART |
Steven Webb
|
|
|
terry- ###-#### energy code ok to cover-need to provide an energy report prior to issuance of c. of c. at final. 10/2/2001 9:09:19 AM
|
BLD-Energy code compliance | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | CANC |
Steven Webb
|
|
|
terry ###-#### energy code--per terry cancel this one/mls needed something else
|
BLD-Framing/Rough-in | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PASS |
Steven Webb
|
|
|
terry ###-#### fr ok to insulate 9/27/2001 3:33:58 PM
|
BLD-Framing/Rough-in | 9/25/2001 | 9/26/2001 | 9/26/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### cn--air seal package not done. 9/26/2001 9:36:16 AM
|
BLD-Framing/Rough-in | 9/14/2001 | 9/17/2001 | 9/17/2001 | P | PART |
Tom Arcoraci
|
|
|
sheer wall ###-#### terry ok to side 9/17/2001 4:28:06 AM
|
BLD-Footing | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | PART |
Tom Arcoraci
|
|
|
steve ###-####
|
BLD-Foundation | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 10:18:19. Contact: ###-####.
|
BLD-Footing | 7/26/2001 | 7/26/2001 | 7/26/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 10:17:14. Contact: ###-####. wip 7/26/2001 11:00:09 AM
|