BLD-Final | 10/23/2001 | 10/23/2001 | 10/23/2001 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 06:27:49. Contact: ###-####. Cancelled by contractor 10/23/2001 9:10:50 AM
|
BLD-Final | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PASS |
Steven Webb
|
|
|
###-#### dave c. of c. # 20622 10/23/2001 2:25:06 PM
|
BLD-Energy code compliance | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 09:35:02. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 9/17/2001 3:44:35 AM
|
BLD-Framing/Rough-in | 9/13/2001 | 9/13/2001 | 9/13/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 10:31:49. Contact: ###-####. c/n issued--ok to insulate 9/13/2001 6:22:00 PM
|
BLD-Wall cover | 8/29/2001 | 8/31/2001 | 8/31/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 07:08:15. Contact: ###-####. hold downs are installed on colmns still need to finish screwing to post steve will check them this afternoon 8/31/2001 8:47:16 AM
|
BLD-Wall cover | 8/30/2001 | 8/30/2001 | 8/30/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 06:51:00. Contact: ###-####. c/n--ok to side house but not front porch columns 8/30/2001 9:12:38 AM
|
BLD-Foundation | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | PART |
Steven Webb
|
|
|
###-#### wip 7/20/2001 3:07:50 PM
|
BLD-Footing | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PART |
Steven Webb
|
|
|
would like this at 11:00\\###-#### wip 7/19/2001 11:08:12 AM
|