BLD-Conference | 6/24/2002 | 6/24/2002 | 6/24/2002 | A | PASS |
Jim Storey
|
|
|
425 finaled
|
BLD-Final | 10/30/2001 | 10/31/2001 | 10/31/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### TRAVIS CALL FIRST c.c # 21689 issued 10/31/2001 10:37:08 AM
|
BLD-Final | 10/30/2001 | 10/30/2001 | 10/30/2001 | P | FAIL |
Dave Hannah
|
|
|
Added by Inspector: 425 On 10/30/2001 2:52:41 PM c/ n on site
|
BLD-Final | 10/26/2001 | 10/30/2001 | 10/30/2001 | P | CANC |
Dave Hannah
|
|
|
###-#### TRAVIS
|
BLD-Final | 10/23/2001 | 10/24/2001 | 10/24/2001 | P | FAIL |
Jim Storey
|
|
|
###-#### TRAVIS no access wet floor. 10/24/2001 4:07:38 PM
|
BLD-Energy code compliance | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Jim Storey
|
|
|
###-#### call first
|
BLD-Framing/Rough-in | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Jim Storey
|
|
|
briggs engineering justified as built sheer panel design. 9/6/2001 10:25:00 AM
|
BLD-Energy code compliance | 8/31/2001 | 9/3/2001 | 9/3/2001 | A | NR |
Jim Storey
|
|
|
###-#### TRAVIS
|
BLD-Framing/Rough-in | 8/31/2001 | 9/3/2001 | 9/3/2001 | A | NR |
Jim Storey
|
|
|
###-#### TRAVIS
|
BLD-Energy code compliance | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### travis posted c/n to install interior shear as,indicated by prior corretion, noted safety glass to be resolved by final. 8/30/2001 12:50:27 PM
|
BLD-Framing/Rough-in | 8/28/2001 | 8/29/2001 | 8/29/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/28/2001 at 13:03:17. Contact: ###-####. saftey glazing top of stairs and 24 of 2nd floor door. seal attic ele boxes.sheer interior walls per plan. 8/29/2001 9:26:30 AM
|
BLD-Framing/Rough-in | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | FAIL |
Steven Webb
|
|
|
scott ###-####C/N posted--need approved plans, mechanical and fireplace rough in prior to framing. 8/27/2001 2:14:47 PM
|
BLD-Framing/Rough-in | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | PART |
Tom Arcoraci
|
|
|
Scott ###-#### shear ok to side 8/21/2001 3:13:50 AM
|
BLD-Foundation | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/18/2001 at 16:46:29. Contact: ###-####.
|
BLD-Footing | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Foundation | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | NR |
Jim Storey
|
|
|
stem wall
|