BLD-Final | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | PASS |
Jim Sly
|
|
|
for gar access 2468--lori ###-#### fn occ
|
BLD-Energy code compliance | 9/4/2001 | 9/4/2001 | 9/4/2001 | P | PASS |
Jim Sly
|
|
|
energy code -###-#### lori Frame Pass 9/4/2001 2:17:11 PM
|
BLD-Framing/Rough-in | 8/29/2001 | 8/31/2001 | 8/31/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### ###-#### anita C/N posted. 8/31/2001 2:30:25 PM
|
BLD-Framing/Rough-in | 8/21/2001 | 8/22/2001 | 8/22/2001 | P | PART |
Jim Sly
|
|
|
lori ###-#### shear shear OK 8/23/2001 9:46:26 AM
|
BLD-Foundation | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 12:02:32. Contact: ###-####.
|
BLD-Footing | 7/30/2001 | 7/30/2001 | 7/30/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 06:44:50. Contact: ###-####.
|
BLD-Footing | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 10:45:31. Contact: ###-####.r 7/27/2001 3:04:45 PM sch for monday 7/27/2001 3:05:06 PM
|