BLD-Final | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
Permanent Occupancy | | 9/24/2001 | 9/24/2001 | | DONE |
|
|
|
|
BLD-Final | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | FAIL |
Jim Sly
|
|
|
pam ###-#### fn pam NR ###-#### fn 9/18/2001 12:02:53 PM
|
BLD-Final | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 11:42:08. Contact: ###-####. Temp Occ.......... Need all req signatures for perm Occ. 9/7/2001 1:06:48 PM 9/7/2001 1:09:24 PM
|
FIRE-Final Inspection | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 9/7/2001 10:19:16 AM
|
BLD-Final | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 07:30:46. Contact: ###-####.
|
FIRE-Final Inspection | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | FAIL |
Joe Tawney
|
|
|
Reinsp Fail 9/5/2001 10:40:41 AM
|
FIRE-Final Inspection | 8/31/2001 | 9/4/2001 | 9/4/2001 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 08:57:54. Contact: ###-####. will reschedule; 409 ran out of time 9/4/2001 3:20:33 PM
|
BLD-Final | 8/29/2001 | 8/31/2001 | 8/31/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 14:54:28. Contact: ###-####. Need signatures. 8/31/2001 4:32:54 PM
|
FIRE-Final Inspection | 8/28/2001 | 8/30/2001 | 8/30/2001 | | FAIL |
Joe Tawney
|
|
|
Reinsp Fail 4 hr gen load test. 8/30/2001 4:04:40 PM Smoke seals, closers, & Astrigals on all rated & double rated doors. Int med temp heads for hds too close to supply reg. (on order) 8/30/2001 5:01:47 PM
|
FIRE-Final Inspection | 8/24/2001 | 8/27/2001 | 8/27/2001 | P | FAIL |
Joe Tawney
|
|
|
Final 8/27/2001 4:20:49 PMFail C/N issueed 8/27/2001 4:20:59 PM
|