BLD-Final | 11/19/2001 | 11/19/2001 | 11/19/2001 | P | PASS |
Jim Sly
|
|
|
###-#### COLE C/C issued. 11/20/2001 9:51:42 AM
|
BLD-Aging Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 | | PART |
Jim Sly
|
|
|
WIP 11/13/2001 11:40:28 AM
|
BLD-Energy code compliance | 9/12/2001 | 9/13/2001 | 9/13/2001 | A | PASS |
Jim Sly
|
|
|
kole ###-#### Frame pass 9/13/2001 9:39:05 AM
|
BLD-Framing/Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 | P | PASS |
Dave Hannah
|
|
|
kole crofts - ###-#### re-insp fr c/n items completed crews are 9/12/2001 2:04:56 PM still working on insulation 9/12/2001 2:05:25 PM
|
BLD-Framing/Rough-in | 9/7/2001 | 9/10/2001 | 9/10/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### COLE C/N posted 9/10/2001 3:05:55 PM
|
BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 | A | PART |
Jim Sly
|
|
|
###-#### shear Shear OK 8/24/2001 12:46:05 PM
|
BLD-Framing/Rough-in | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 10:16:43. Contact: ###-####. Need approved plans for shear insp. 8/23/2001 10:18:32 AM
|
BLD-Foundation | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 20:43:56. Contact: ###-####. steel on site boards not on site 7/31/2001 10:30:56 PM
|
BLD-Footing | 7/31/2001 | 7/31/2001 | 7/31/2001 | P | PART |
Jim Sly
|
|
|
Chris ###-####
|