BLD-Final | 10/4/2001 | 10/4/2001 | 10/4/2001 | P | PASS |
Russ Owen
|
|
|
Final ok for perm. occ.
|
FIRE-Final Inspection | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | PASS |
Joe Tawney
|
|
|
Corrections taken care of. OK for perm. occ. 10/4/2001 10:28:19 AM
|
Permanent Occupancy | | 10/4/2001 | 10/4/2001 | | DONE |
|
|
|
|
BLD-Final | 9/28/2001 | 10/1/2001 | 10/1/2001 | A | NR |
Russ Owen
|
|
|
fn -###-####- larr;y needs fire/lifesafety. 10/1/2001 9:46:08 AM
|
FIRE-Final Inspection | 9/27/2001 | 9/28/2001 | 9/28/2001 | P | FAIL |
Joe Tawney
|
|
|
###-####. Final fail. See c/n. 10/1/2001 10:27:06 AM
|
BLD-Wall cover | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 17:03:28. Contact: ###-####. ALL C/N COMPLETED OK TO COVER 9/11/2001 9:45:07 AM
|
BLD-Wall cover | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 07:55:35. Contact: ###-####.c/n posted. 9/10/2001 2:10:14 PM
|
BLD-Wall cover | 9/6/2001 | 9/7/2001 | 9/7/2001 | P | NH |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 17:11:07. Contact: ###-####.loked out at front door. 9/7/2001 2:23:33 PM
|