Code Occupancy Approval | | | 7/12/2002 | | PASS |
|
|
|
|
BLD-Final | 2/7/2002 | 2/8/2002 | 2/8/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 15:48:13. Contact: .
|
BLD-Final | 1/28/2002 | 1/29/2002 | 1/29/2002 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 11:11:26. Contact: . c/n on site. 1/29/2002 9:56:56 AM
|
BLD-Final | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | FAIL |
Jim Storey
|
|
|
###-#### David handrail returns/ no access. 1/28/2002 5:11:21 PM
|
FIRE-Final Inspection | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | CANC |
Rick Jackson
|
|
|
KEY PAD OF GARAGE DOOR 1357 ENTER ###-#### fire not required; called the number and he will schedule for structural 1/25/2002 9:47:04 AM
|
BLD-Energy code compliance | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 10/18/2001 3:32:18 PM
|
BLD-Framing/Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Energy code compliance | 10/15/2001 | 10/16/2001 | 10/16/2001 | A | NR |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 10/15/2001 | 10/16/2001 | 10/16/2001 | A | PART |
Jim Storey
|
|
|
sheer interior. 10/16/2001 10:30:42 AM
|
BLD-Energy code compliance | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | NR |
Russ Owen
|
|
|
David, ###-#### C/N needs Mec approved, Also plans with truss details are not on site, no inspection done. 10/9/2001 3:24:13 PM
|
BLD-Framing/Rough-in | 9/21/2001 | 9/21/2001 | 9/21/2001 | P | PART |
Jim Storey
|
|
|
david ###-#### shear exterior ok 9/21/2001 4:33:55 PM
|
BLD-Framing/Rough-in | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | NR |
Jim Storey
|
|
|
shear wall david ###-####
|
BLD-Foundation | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Footing | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PART |
Russ Owen
|
|
|
Todd ###-####
|