BLD-Final | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | PASS |
Steven Webb
|
|
|
###-#### garage code 5296enter 22415 issued. 12/4/2002 10:04:26 AM
|
BLD-Aging Inspection | 1/16/2002 | 1/16/2002 | 1/16/2002 | | PART |
Jim Sly
|
|
|
WIP 1/16/2002 11:09:22 AM
|
BLD-Footing | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | CANC |
Jim Sly
|
|
|
###-#### BILL Contr called in wrong permit. 11/16/2001 2:29:08 PM
|
BLD-Framing/Rough-in | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PASS |
Jim Sly
|
|
|
and sheer wall ###-#### shane Energy OK. 10/15/2001 3:37:41 PM
|
BLD-Framing/Rough-in | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PASS |
Jim Sly
|
|
|
###-#### SHANE
|
BLD-Framing/Rough-in | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | PART |
Jim Sly
|
|
|
Added by Inspector: 316 On 10/8/2001 4:08:35 PM Shear wall OK per Re-Engineering.
|
BLD-Framing/Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | FAIL |
Jim Sly
|
|
|
SHEER WALL ###-#### SHANE Complete nailing per Eng. 10/3/2001 2:49:55 PM
|
BLD-Framing/Rough-in | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | FAIL |
Jim Sly
|
|
|
shear shane ###-#### C/N posted. 9/24/2001 3:25:37 PM
|
BLD-Other | 9/20/2001 | 9/21/2001 | 9/21/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/20/2001 at 12:40:36. Contact: ###-####.
|
BLD-Foundation | 8/16/2001 | 8/17/2001 | 8/17/2001 | P | PASS |
Jim Sly
|
|
|
###-#### jeff
|
BLD-Footing | 8/15/2001 | 8/16/2001 | 8/16/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 15:59:29. Contact: ###-####.
|