BLD-Final | 10/23/2001 | 10/24/2001 | 10/24/2001 | P | PASS |
Jim Sly
|
|
|
###-#### DAVE C/C issued 10/24/2001 4:09:31 PM
|
BLD-Energy code compliance | 9/4/2001 | 9/4/2001 | 9/4/2001 | P | PASS |
Jim Sly
|
|
|
jp ###-#### energy code
|
BLD-Framing/Rough-in | 8/24/2001 | 8/28/2001 | 8/28/2001 | A | PASS |
Jim Sly
|
|
|
jp ###-####
|
BLD-Foundation | 8/3/2001 | 8/3/2001 | 8/3/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 05:59:30. Contact: ###-####.
|
BLD-Footing | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 08:06:02. Contact: ###-####.
|