BLD-Final | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### clive needs 24 ga etal to reduce clearances at stove, as per umc and national fuel gas codes. 7/11/2002 12:20:44 PM
|
BLD-Final | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PASS |
Russ Owen
|
|
|
|
BLD-Final | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | NR |
Dave Hannah
|
|
|
###-#### still needs elec final 7/10/2002 10:44:41 AM
|
BLD-Final | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | FAIL |
Russ Owen
|
|
|
GEORGE ###-#### c/n posted,safety glasss electrical and gas stove clearance. 7/9/2002 2:49:20 PM
|
BLD-Aging Inspection | 1/30/2002 | 1/30/2002 | 1/30/2002 | | PART |
Tom Arcoraci
|
|
|
wip 1/30/2002 8:14:27 AM
|
BLD-Framing/Rough-in | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ok to insulate 11/30/2001 11:55:08 AM
|
BLD-Framing/Rough-in | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | FAIL |
Russ Owen
|
|
|
clive ###-####
|
BLD-Framing/Rough-in | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Tom Arcoraci
|
|
|
george -###-#### shear ok to side 11/7/2001 9:44:04 AM
|
BLD-Framing/Rough-in | 10/1/2001 | 10/2/2001 | 10/2/2001 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### no plans 10/2/2001 11:07:17 AM
|
BLD-Foundation | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 10:41:26. Contact: ###-####.
|
BLD-Footing | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### randy wip 8/15/2001 2:41:08 AM
|