BLD-Final | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Tom Arcoraci
|
|
|
Inspection on driveway for bond release - call Cathy drive completed 2/22/2002 4:39:24 PM
|
BLD-Final | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### george needs to post bond for drive way the rest is ok 11/28/2001 2:55:58 PM
|
BLD-Energy code compliance | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | CANC |
Steven Webb
|
|
|
fr insp george cell ###-#### Duplicate inspection request. 9/25/2001 8:55:10 AM
|
BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PASS |
Steven Webb
|
|
|
fr insp george cell ###-#### ok to cover 9/25/2001 8:54:54 AM
|
BLD-Framing/Rough-in | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PASS |
Jim Storey
|
|
|
fr george ###-#### cell cripple above bearing wall to garage above header/ fire blk. unuable space at stair. 9/20/2001 10:27:35 AM
|
BLD-Framing/Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PASS |
Jim Storey
|
|
|
ready at 1 ###-#### George call to meet there sheer ok 9/7/2001 2:26:08 PM
|
BLD-Footing | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | NR |
Dave Hannah
|
|
|
###-#### they will reschedule for pm 8/14/2001 10:41:25 AM
|
BLD-Foundation | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Jim Storey
|
|
|
###-#### tod
|
BLD-Footing | 8/10/2001 | 8/10/2001 | 8/10/2001 | P | NR |
Jim Storey
|
|
|
FT INSP TODD ###-#### over exavated at tree roots ok forms not set up for insp. 8/10/2001 5:31:20 PM
|