BLD-Final | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 17:25:08. Contact: . C/C issued. 10/9/2001 11:33:39 AM
|
BLD-Energy code compliance | 8/24/2001 | 8/31/2001 | 8/31/2001 | A | PASS |
Jim Sly
|
|
|
jp ###-#### Frame pass 8/31/2001 2:47:47 PM
|
BLD-Framing/Rough-in | 8/24/2001 | 8/29/2001 | 8/29/2001 | A | FAIL |
Jim Sly
|
|
|
jp ###-#### C/N posted 8/29/2001 12:33:22 PM
|
BLD-Foundation | 8/9/2001 | 8/9/2001 | 8/9/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 07:10:18. Contact: ###-####.
|
BLD-Footing | 8/8/2001 | 8/8/2001 | 8/8/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 07:55:37. Contact: ###-####.
|