Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-02054
StatusExpired
Name FERGUSON JAMES V &
Site Address 5120 W HILL RD
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition 2442s.f. of living space and an attached 878s.f. 3-car garage to an existing 1939s.f. single family dwelling. Work to include the removal of the entire roof system, adding a 2414s.f. 2nd floor and 1028s.f. to the main level. the tall walls are to be constructed per the engineering attached. R-1C setbacks are ok per ajb, hillside requirements are waved by terry records 7/9.2001 All per the approved plans as marked. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance12/12/200212/12/200212/12/2002APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 12/12/2002 at 05:50:35. Contact: ###-####.up stairs ok pending trades 12/12/2002 10:59:59 AM
BLD-Conference12/10/200212/11/200212/11/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/10/2002 at 17:23:49. Contact: ###-####.conf. on stairs 12/12/2002 9:57:00 AM
BLD-Conference12/11/200212/11/200212/11/2002PDONE
DetailsTony Young
###-####
BLD-Framing/Rough-in8/13/20028/15/20028/14/2002PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 08/13/2002 at 07:35:27. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/14/2002 at 07:09:26.
BLD-Energy code compliance8/14/20028/14/20028/14/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/14/2002 at 07:12:36. Contact: ###-####.
3 rooms upstairs not complete 8/14/2002 2:26:01 PM
BLD-Framing/Rough-in8/14/20028/14/20028/14/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/14/2002 at 07:10:56. Contact: ###-####.
BLD-Framing/Rough-in5/21/20025/21/20025/21/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/21/2002 at 10:17:15. Contact: ###-####.
ok to cover atrium and downstairs, pending trades 5/21/2002 3:18:51 PM
BLD-Framing/Rough-in4/23/20024/24/20024/24/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 04/23/2002 at 13:18:59. Contact: ###-####.
ok to cover fireplace chase 4/24/2002 9:03:47 AM
BLD-Framing/Rough-in3/18/20023/18/20023/18/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 03/18/2002 at 07:33:02. Contact: ###-####.
ok to insulate atrium walls, garage, kitchen, on unaffected areas //// need trade sign offs, truss engineering, fire blocks, draft stops, point loads 3/18/2002 4:50:09 PM
BLD-Framing/Rough-in12/21/200112/21/200112/21/2001PPART
DetailsTony Young
JAMES ###-####
ok to cover part of kitchen to place cabinets, pending trades 12/21/2001 5:10:24 PM
BLD-Framing/Rough-in12/10/200112/10/200112/10/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/10/2001 at 05:44:01. Contact: ###-####.
ext. shear ok 12/10/2001 10:19:37 AM
BLD-Framing/Rough-in11/16/200111/19/200111/19/2001PFAIL
DetailsTony Young
###-#### JAMES SHEER NAIL
need letter from str. engineer approving shear as built///c/n posted 11/19/2001 2:36:11 PM
BLD-Aging Inspection10/15/200110/15/200110/15/2001 PART
DetailsTony Young
wip 10/15/2001 8:40:27 AM
BLD-Energy code compliance8/14/20018/14/20018/14/2001PPART
DetailsTony Young
###-#### troy
slab insulation ok 8/15/2001 10:07:17 AM
BLD-Footing8/6/20018/7/20018/7/2001APART
DetailsTony Young
wip, verbal corrections 8/7/2001 12:05:33 PM
BLD-Footing8/6/20018/6/20018/6/2001PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 08/06/2001 at 08:52:46. Contact: ###-####.
BLD-Conference7/31/20018/1/20018/1/2001APART
DetailsDave Hannah
###-#### work in progress 8/1/2001 11:07:07 AM
BLD-Conference7/30/20017/31/20017/31/2001PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 07/30/2001 at 16:09:10. Contact: ###-####.
FIRE-Conference7/30/20017/31/20017/31/2001ACANC
DetailsJoe Tawney
Cancel should be structural conference 7/30/2001 4:03:46 PM