BLD-Conference | 7/18/2002 | 7/19/2002 | 7/19/2002 | A | PASS |
Carl Dependahl
|
|
|
w/ owner, l/c isued, rec'd card...ok to doc final. 7/19/2002 3:41:52 PM
|
BLD-Final | 7/19/2002 | 7/19/2002 | 7/19/2002 | P | PASS |
Carl Dependahl
|
|
|
|
BLD-Conference | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | NH |
Carl Dependahl
|
|
|
|
BLD-Conference | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | NR |
Carl Dependahl
|
|
|
WILL RECALL 7/18/2002 5:45:04 PM
|
BLD-Final | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | PASS |
Carl Dependahl
|
|
|
###-####
|
BLD-Conference | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### talk about front porch frame, wood burning fireplace code
|
BLD-Framing/Rough-in | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### EVA SHEER WALL ; int ,ext ok. 11/14/2001 12:21:48 PM
|
BLD-Energy code compliance | 11/8/2001 | 11/9/2001 | 11/9/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### ok to cover , keep c/n...gyp shear, underfloor supports, insul, & vapor barrier; hangers at porch joists, porch roof not framed. chk stairs rails, etc at final. 11/9/2001 12:16:19 PM
|
BLD-Framing/Rough-in | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 09:59:55. Contact: ###-####. keep c/n, ok to insulate only;med press. gas piping still failed. 11/7/2001 4:43:00 PM
|
BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 16:56:08. Contact: ###-####...c/n, need air seal, complete gas test, rest heating ok. nail off hangers, straps, etc. 11/6/2001 11:42:44 AM
|
BLD-Framing/Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 11/6/2001 11:41:17 AM reinsp for air seal ###-#### nr, keep c/n. 11/6/2001 5:33:33 PM
|
BLD-Framing/Rough-in | 11/2/2001 | 11/5/2001 | 11/5/2001 | P | NR |
Carl Dependahl
|
|
|
###-####; need hvac ok 11/6/2001 12:02:03 PM
|
BLD-Conference | 9/28/2001 | 10/1/2001 | 10/1/2001 | A | CANC |
Tony Young
|
|
|
###-#### Eva
|
BLD-Conference | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PASS |
Tony Young
|
|
|
eva ###-#### 10/1/2001 11:44:09 AM
on shear over sheeting, block and nail as reqd.,, roof collar ties, as drawn or have arch. re-draw (they want to raise ceiling joists/collar ties higher).,,,, and on floor over front room, need to add joists to lessen deflection. 10/1/2001 12:52:28 PM
|
BLD-Conference | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/21/2001 3:13:18 PM reviewed resubmittal, archived
|
BLD-Foundation | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PART |
Carl Dependahl
|
|
|
FOUND WALL TIM ###-#### ...wall looks ok; nobody onsite w/ plans; add'n/remodel. 8/15/2001 7:23:55 AM
|
BLD-Footing | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/14/2001 4:32:17 PM w/ concrete contractor ...re plans, no hd's shown, added by bldr. ok
|
BLD-Conference | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PART |
Carl Dependahl
|
|
|
Eva, ###-####; w/ framer: need list of proposed modifications, framing diagrams for new or existing (where grossly overspanned) ,may delete massive ridge beams where conventional rules apply if requested in writing. 8/10/2001 10:39:49 AM
|
BLD-Conference | 8/8/2001 | 8/8/2001 | 8/8/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/8/2001 8:12:27 AM w/fnd contractor...re steel, ok per plans
|
BLD-Footing | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 17:22:25. Contact: ###-####. work in progress 8/8/2001 11:53:57 AM
|
BLD-Footing | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PART |
Carl Dependahl
|
|
|
ft tim ###-#### ...ftg looks ok, need plan. recall for walls 8/7/2001 5:21:45 PM
|