BLD-Final | 12/21/2001 | 12/24/2001 | 12/24/2001 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Energy code compliance | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 10/23/2001 5:20:24 PM
|
BLD-Framing/Rough-in | 10/22/2001 | 10/23/2001 | 10/23/2001 | P | PASS |
Jim Storey
|
|
|
###-#### DOUG c/n made ok engery ok for cover. 10/23/2001 5:20:13 PM
|
BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | PART |
Dave Hannah
|
|
|
###-#### c/n on site ok to insulate 10/19/2001 10:37:49 AM
|
BLD-Framing/Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | CANC |
Jim Sly
|
|
|
###-#### doug ###-#### Cancelled by contr. 10/18/2001 3:18:23 PM
|
BLD-Framing/Rough-in | 10/5/2001 | 10/8/2001 | 10/8/2001 | A | PASS |
Jim Storey
|
|
|
###-#### doug shear nailling ok for exterior cover. 10/8/2001 10:06:47 AM
|
BLD-Foundation | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### WIP HDS NOT IN PLACE 8/27/2001 10:22:25 PM
|
BLD-Footing | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### larry wip, looks ok. 8/27/2001 11:26:52 AM
|