BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PASS |
Steven Webb
|
|
|
randy-- ###-#### fn gar code is 7550 C. of C. #22150 issued. 1/29/2002 12:42:39 PM
|
BLD-Aging Inspection | 1/28/2002 | 1/28/2002 | 1/28/2002 | | PASS |
Steven Webb
|
|
|
permit active 1/28/2002 7:55:11 AM
|
BLD-Energy code compliance | 11/26/2001 | 11/27/2001 | 11/27/2001 | A | PASS |
Steven Webb
|
|
|
RANDY ###-#### ok to cover 11/27/2001 9:08:28 AM
|
BLD-Framing/Rough-in | 11/21/2001 | 11/23/2001 | 11/23/2001 | A | FAIL |
Steven Webb
|
|
|
C/n prior c/n items not completed--do not insulate. 11/23/2001 9:50:27 AM
|
BLD-Framing/Rough-in | 11/23/2001 | 11/23/2001 | 11/23/2001 | P | PASS |
Steven Webb
|
|
|
dan ###-#### ok to insulate. 11/23/2001 1:11:33 PM
|
BLD-Framing/Rough-in | 11/19/2001 | 11/21/2001 | 11/21/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### c/n issued--do not insulate 11/21/2001 12:59:33 PM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/14/2001 | 11/14/2001 | P | PART |
Steven Webb
|
|
|
###-#### SHEAR WALL--ok to side except area the approved plans call out for H6-Stud straps (2) (right side of upper floor ). 11/14/2001 1:31:35 PM
|
BLD-Framing/Rough-in | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | FAIL |
Steven Webb
|
|
|
shear-- troy- ###-#### c/n posted 11/7/2001 10:09:06 AM
|
BLD-Foundation | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Steven Webb
|
|
|
###-#### wall wip 10/9/2001 1:50:22 PM
|
BLD-Footing | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | PART |
Dave Hannah
|
|
|
###-#### chris wall work in progress 10/8/2001 4:26:49 PM
|
BLD-Footing | 10/5/2001 | 10/5/2001 | 10/5/2001 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/05/2001 at 10:07:37. Contact: ###-####. Canceled by contractor 10/5/2001 1:00:35 PM
|