Permit Information
Permit NumberBLD01-02199
StatusFinaled
Name ROTH DESIGN/BUILD
Site Address 3126 S LONGLEAF AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2354 sq. ft. one story single family dwelling with a 966 sq. ft. attached three car garage, a covered entry way, a 144 sq. ft. covered gateway and a 298 sq. ft. partially covered concrete patio at rear of structure per approved plans, all engineering/red lining and attached requirement lists. PC #575 CUP #98-116 SOLAR PROTECTED SHADE RESTRICTED DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/27/20023/28/20023/28/2002APASS
DetailsSteven Webb
fn occ allan ###-#### c. of c. #22174 issued 3/28/2002 9:21:01 AM
BLD-Final3/20/20023/25/20023/25/2002ANR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/20/2002 at 19:21:42. Contact: ###-####. c/n posted--needs all trade finals prior to final building inspection. 3/25/2002 9:03:41 AM
BLD-Framing/Rough-in12/13/200112/13/200112/13/2001PPASS
DetailsSteven Webb
###-#### interior sheer 12/13/2001 12:59:45 PM
BLD-Framing/Rough-in12/4/200112/5/200112/5/2001APASS
DetailsSteven Webb
JOSH ###-#### Insulation already done, ok to cover. 12/5/2001 9:53:25 AM
BLD-Framing/Rough-in12/4/200112/4/200112/4/2001PFAIL
DetailsSteven Webb
jason ###-#### c/n posted--house was insulated when my prior c/n stated that they do not insulate. Unable to perform inspection--informed builder to remove insulation which is above the standard wall height to enable a roof frame to be performed. 12/4/2001 2:08:35 PM
BLD-Framing/Rough-in12/3/200112/3/200112/3/2001PFAIL
DetailsSteven Webb
JASON ###-#### c/n posted on site--No truss package provided for frame inspection--this is needed to perform the inspection. Please provide the truss package for next inspection as well as the approved plans 12/3/2001 2:41:28 PM 12/3/2001 2:42:13 PM
BLD-Framing/Rough-in10/23/200110/24/200110/24/2001APASS
DetailsSteven Webb
###-#### JASON SHEER WALL ok to side 10/24/2001 11:23:01 AM
BLD-Energy code compliance10/9/200110/10/200110/10/2001ACANC
DetailsSteven Webb
###-####- jason Cancelled by contractor 10/10/2001 8:39:44 AM
BLD-Framing/Rough-in10/9/200110/10/200110/10/2001ACANC
DetailsSteven Webb
###-####- jasonCancelled by contractor 10/10/2001 8:39:52 AM
BLD-Foundation9/18/20019/19/20019/19/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/18/2001 at 19:06:36. Contact: ###-####. work inprogress crew is still tieing rebar 9/19/2001 11:13:12 AM
BLD-Footing9/17/20019/18/20019/18/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/17/2001 at 18:14:56. Contact: ###-####. work in progress 9/18/2001 9:29:10 AM
BLD-Footing9/17/20019/17/20019/17/2001PFAIL
DetailsRuss Owen
mana- ###-#### ft rear set backs. 9/17/2001 4:39:52 PM