BLD-Final | 12/7/2001 | 12/10/2001 | 12/10/2001 | A | PASS |
Jim Sly
|
|
|
JOHN ###-#### C/C issued. 12/10/2001 9:33:12 AM
|
BLD-Aging Inspection | 12/5/2001 | 12/5/2001 | 12/5/2001 | | PART |
Jim Sly
|
|
|
WIP 12/5/2001 3:16:25 PM
|
BLD-Aging Inspection | 12/5/2001 | 12/5/2001 | 12/5/2001 | | PART |
Jim Sly
|
|
|
WIP 12/5/2001 3:16:25 PM
|
BLD-Energy code compliance | 9/30/2001 | 10/1/2001 | 10/1/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/30/2001 at 20:36:45. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/24/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 20:02:16. Contact: ###-####.
|
BLD-Foundation | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PART |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | PART |
Jim Sly
|
|
|
ft insp ###-#### -paul
|