BLD-Final | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### key above door
|
BLD-Final | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | NR |
Jim Storey
|
|
|
###-#### need ele 3/14/2002 4:15:50 PM
|
BLD-Final | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### no access in to bldg. 3/13/2002 4:43:27 PM
|
BLD-Framing/Rough-in | 2/26/2002 | 2/26/2002 | 2/26/2002 | P | PART |
Jim Storey
|
|
|
###-#### garage shear ok all but 16 ft door openings. 2/26/2002 3:19:50 PM
|
BLD-Foundation | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 14:31:07. Contact: ###-####. All OK except HD's per cond 1:16....Discussed with conc contr ....To be done exactly per Eng. 2/19/2002 10:41:02 AM
|
BLD-Footing | 2/15/2002 | 2/15/2002 | 2/15/2002 | P | PART |
Jim Storey
|
|
|
ft eric ###-#### wip 2/15/2002 1:19:43 PM
|
BLD-Energy code compliance | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Steven Webb
|
|
|
justin ###-#### energy
|
BLD-Framing/Rough-in | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | PART |
Jim Storey
|
|
|
JUSTON ###-#### check porch trusses at ec insp. 2/7/2002 8:17:17 AM
|
BLD-Framing/Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PART |
Jim Storey
|
|
|
###-#### main house ok porch pending trusses/ no garage ok to insulate. 2/6/2002 1:16:27 PM
|
BLD-Framing/Rough-in | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | NR |
Jim Storey
|
|
|
###-####
|
BLD-Foundation | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | PART |
Jim Storey
|
|
|
###-#### wip 12/20/2001 1:19:57 PM
|
BLD-Footing | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 07:51:26. Contact: ###-####.
|