BLD-Final | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | PASS |
Jim Storey
|
|
|
justsin ###-#### fn
|
BLD-Energy code compliance | 11/8/2001 | 11/8/2001 | 11/8/2001 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 11/8/2001 10:53:33 AM ec ok
|
BLD-Framing/Rough-in | 11/8/2001 | 11/8/2001 | 11/8/2001 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 11/8/2001 10:53:01 AM c/n made ok.
|
BLD-Energy code compliance | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | NH |
Jim Storey
|
|
|
justin ###-#### no access 11/8/2001 9:01:52 AM
|
BLD-Framing/Rough-in | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | NH |
Jim Storey
|
|
|
fr insp justin ###-#### no access 11/8/2001 9:01:40 AM
|
BLD-Conference | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | NR |
Jim Storey
|
|
|
justin- ###-#### for conf--call 1st before insp please need patch from franklin or replace joist. 11/5/2001 3:06:58 PM
|
BLD-Framing/Rough-in | 10/30/2001 | 10/31/2001 | 10/31/2001 | A | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site ok to insulate 10/31/2001 10:17:14 AM
|
BLD-Framing/Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | PASS |
Steven Webb
|
|
|
shear for gar justing ###-#### SHEAR--OK TO SIDE 10/18/2001 9:16:40 AM
|
BLD-Foundation | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | PASS |
Russ Owen
|
|
|
ryan -###-#### found wall
|
BLD-Footing | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | PART |
Tom Arcoraci
|
|
|
dane- ###-#### wip 10/5/2001 11:07:07 AM
|
BLD-Framing/Rough-in | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Jim Storey
|
|
|
shear- justin ###-#### nailling ok. 10/2/2001 3:56:37 PM
|
BLD-Framing/Rough-in | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PASS |
Steven Webb
|
|
|
shear-- justin ###-#### ok to side-address is 1613 not 1611 for this permit. 10/1/2001 2:40:58 PM
|
BLD-Foundation | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 07:20:24. Contact: ###-####. out of time to insp. 9/10/2001 5:56:49 PM
|
BLD-Footing | 9/5/2001 | 9/5/2001 | 9/5/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 07:21:20. Contact: ###-####. appears to meet set backs need plans on site pwoi 9/5/2001 12:45:07 PM
|