BLD-Final | 4/12/2002 | 4/15/2002 | 4/15/2002 | A | PASS |
Dave Hannah
|
|
|
Cathy has the bond - c.c issued by cathy down town 4/15/2002 9:14:44 AM
|
BLD-Final | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | NR |
Tony Young
|
|
|
###-####
|
BLD-Grading Inspection | 4/12/2002 | 4/12/2002 | 4/12/2002 | | BOND |
Rita DeYoung
|
|
|
grading is complete. However revegetation and the construction of a short retaining wall must still be done. The engineer has recommended a $2400.00 bond. Upon receipt of this bond the grading and drainage are conditionally approved.
|
BLD-Final | 4/10/2002 | 4/11/2002 | 4/11/2002 | A | NR |
Dave Hannah
|
|
|
###-#### needs drive way poured needs hillside ord singoff no inspection done at this time talked with johny he will get going on these item and reschedule final 4/11/2002 9:25:09 AM
|
BLD-Energy code compliance | 1/15/2002 | 1/16/2002 | 1/16/2002 | P | PASS |
Tom Arcoraci
|
|
|
JONNY ###-####
|
BLD-Energy code compliance | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | PASS |
Tom Arcoraci
|
|
|
JONNY ###-#### framing ok 1/16/2002 10:16:27 AM
|
BLD-Framing/Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 | P | PART |
Tony Young
|
|
|
###-####
c/n posted, ok to insulate 1/11/2002 1:36:47 PM
|
BLD-Framing/Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | NR |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 | P | FAIL |
Tony Young
|
|
|
###-####
not ready, no inspection made, need trades signed off 1/10/2002 3:00:45 PM
|
BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | NR |
Dave Hannah
|
|
|
###-#### stopped at site contractor said that he scheduled it for a pm inspection and that he was not ready asked if i would reschedule it for him 1/10/2002 9:28:43 AM
|
BLD-Framing/Rough-in | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | CANC |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 1/10/2002 9:29:21 AM
|
BLD-Framing/Rough-in | 12/13/2001 | 12/14/2001 | 12/14/2001 | P | PART |
Tony Young
|
|
|
###-####
ext. shear ok 12/14/2001 3:41:28 PM
|
BLD-Framing/Rough-in | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | FAIL |
Tony Young
|
|
|
sheer wall jonny ###-####
conf. on framing, finish nailing, 2 HDs, re-call 12/10/2001 2:12:37 PM
|
BLD-Foundation | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Tom Arcoraci
|
|
|
fd ###-####- johnny 2 ft walls and 6ft walls ok 10/12/2001 10:13:38 AM
|
BLD-Footing | 10/9/2001 | 10/10/2001 | 10/10/2001 | P | PART |
Steven Webb
|
|
|
ft insp - howard-- ###-#### Already poured. 10/10/2001 2:37:14 PM
|
BLD-Grading Inspection | 10/9/2001 | 10/9/2001 | 10/9/2001 | | PASS |
Rita DeYoung
|
|
|
Subgrade for upper level footings has been approved by the engineer.
|
BLD-Foundation | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | PART |
Tony Young
|
|
|
713--0487 9/27/2001 3:00:55 PM
ok pending structural engineer approval as built, (was not per approved plan) 9/28/2001 1:08:04 PM
|
BLD-Footing | 9/27/2001 | 9/27/2001 | 9/27/2001 | A | NR |
Tony Young
|
|
|
###-####
|
BLD-Footing | 9/20/2001 | 9/21/2001 | 9/21/2001 | A | PART |
Dave Hannah
|
|
|
around 10 am pretty please Kurt ###-#### no city approved plans on site crew is pouring ftg for basement 2 # 4s horz verts on 18 oc told crew to have city approved plans on site for next inspection 9/21/2001 1:06:46 PM
|