(BIG 5 SPORTING GOODS)(Space #101) Remodel for a new 14,195 sq.ft. retail and storage sporting goods tenant in existing building per approved plans on file. A "Vanilla Finish" permit for this space is being done under BLD01-02186. Work to include two new accessible restrooms, reconfigured interior entry vestibule, two separate new widened exterior doors, new interior walls and doors, interior finish, new suspended ceiling, new draft stop installation, fire sprinkler work, fire alarm work, new plumbing work, mechanical work, and electrical work. Steel storage racking/shelving will be done under a separate permit of BLD01-02584. NOTE: A CERTIFICATE OF OCCUPANCY IS TO BE ISSUED WHEN COMPLETED AND APPROVED. NOTE: This building is fully fire sprinklered for area increase. (P.C.#0686-01) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/11/20023/11/20023/11/2002PDONE
DetailsRuss Owen
Final - ok for perm. occ.
Permanent Occupancy 3/11/20023/11/2002 DONE
Details
FIRE-Alarm Testing11/27/200111/27/200111/27/2001PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 11/27/2001 4:47:08 PM FIre alarm system finaled. OK for perm occ
BLD-Final11/19/200111/20/200111/20/2001ANR
DetailsRuss Owen
###-#### ROBERT. needs fire. 11/26/2001 11:00:49 AM
BLD-Final11/19/200111/20/200111/20/2001ACANC
DetailsTroy Cobbley
Contractor to call in new inspection with building inspector 11/20/2001 10:50:20 AM
FIRE-Final Inspection11/19/200111/20/200111/20/2001APART
DetailsTroy Cobbley
Gave temp signature per Dave Miller for the fire alarm system 11/20/2001 10:49:50 AM
FIRE-Final Inspection11/15/200111/16/200111/16/2001PPASS
DetailsTroy Cobbley
Life/safety finaled. Fire alarm still needs to be approved 11/16/2001 3:12:37 PM 11/16/2001 3:13:17 PM 11/16/2001 3:14:20 PM
BLD-Final11/7/200111/8/200111/8/2001AFAIL
DetailsRuss Owen
DAVE 1-###-####. needs ele and fire insp, no other corrections. 11/8/2001 11:24:03 AM
FIRE-Final Inspection11/7/200111/7/200111/7/2001APASS
DetailsTroy Cobbley
Added by Inspector: 430 On 11/7/2001 10:43:50 AM Fire sprinkler system finaled
BLD-Framing/Rough-in10/26/200110/26/200110/26/2001PPASS
DetailsRuss Owen
###-#### DAVE CEILING
BLD-Framing/Rough-in10/25/200110/25/200110/25/2001PPART
DetailsRuss Owen
CELLING INSPECTION ###-#### DAVE. all ok except front entry , needs perimeter wires. 10/25/2001 4:42:22 PM
BLD-Framing/Rough-in10/24/200110/24/200110/24/2001PPASS
DetailsRuss Owen
###-#### dave
BLD-Framing/Rough-in10/22/200110/23/200110/23/2001APASS
DetailsDave Hannah
SHEER WALL ###-#### DAVID nailing on sheet rock in dressing room 10/23/2001 10:57:14 AM
BLD-Framing/Rough-in10/19/200110/19/200110/19/2001PPART
DetailsRuss Owen
###-####. has some straping to do at front soffit. 10/19/2001 3:54:17 PM
BLD-Framing/Rough-in10/16/200110/17/200110/17/2001PPART
DetailsRuss Owen
###-#### DAVE. waiting for change in design for soffit and tall wall,as engineering was attached to the plans,rear wall in exit corridor has not been constructed. 10/17/2001 1:49:05 PM
BLD-Framing/Rough-in10/15/200110/15/200110/15/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 10/15/2001 3:30:18 PM changing room. 10/15/2001 3:35:12 PM
FIRE-Conference10/12/200110/15/200110/15/2001ADONE
DetailsTroy Cobbley
David Fox, ###-#### or ###-####. I spoke with contractor on what I needed to see. 10/15/2001 12:06:22 PM
BLD-Framing/Rough-in10/12/200110/12/200110/12/2001PPART
DetailsRuss Owen
steel for the door\###-#### or ###-#### david. ok as per eng detail. 10/12/2001 4:41:51 PM
BLD-Framing/Rough-in10/10/200110/11/200110/11/2001PPART
DetailsRuss Owen
###-#### DAVID. need new egineering for all related items on plans. 10/11/2001 4:30:07 PM