BLD-Final | 3/11/2002 | 3/11/2002 | 3/11/2002 | P | DONE |
Russ Owen
|
|
|
Final - ok for perm. occ.
|
Permanent Occupancy | | 3/11/2002 | 3/11/2002 | | DONE |
|
|
|
|
FIRE-Alarm Testing | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/27/2001 4:47:08 PM FIre alarm system finaled. OK for perm occ
|
BLD-Final | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | NR |
Russ Owen
|
|
|
###-#### ROBERT. needs fire. 11/26/2001 11:00:49 AM
|
BLD-Final | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | CANC |
Troy Cobbley
|
|
|
Contractor to call in new inspection with building inspector 11/20/2001 10:50:20 AM
|
FIRE-Final Inspection | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | PART |
Troy Cobbley
|
|
|
Gave temp signature per Dave Miller for the fire alarm system 11/20/2001 10:49:50 AM
|
FIRE-Final Inspection | 11/15/2001 | 11/16/2001 | 11/16/2001 | P | PASS |
Troy Cobbley
|
|
|
Life/safety finaled. Fire alarm still needs to be approved 11/16/2001 3:12:37 PM 11/16/2001 3:13:17 PM 11/16/2001 3:14:20 PM
|
BLD-Final | 11/7/2001 | 11/8/2001 | 11/8/2001 | A | FAIL |
Russ Owen
|
|
|
DAVE 1-###-####. needs ele and fire insp, no other corrections. 11/8/2001 11:24:03 AM
|
FIRE-Final Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/7/2001 10:43:50 AM Fire sprinkler system finaled
|
BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | PASS |
Russ Owen
|
|
|
###-#### DAVE CEILING
|
BLD-Framing/Rough-in | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PART |
Russ Owen
|
|
|
CELLING INSPECTION ###-#### DAVE. all ok except front entry , needs perimeter wires. 10/25/2001 4:42:22 PM
|
BLD-Framing/Rough-in | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | PASS |
Russ Owen
|
|
|
###-#### dave
|
BLD-Framing/Rough-in | 10/22/2001 | 10/23/2001 | 10/23/2001 | A | PASS |
Dave Hannah
|
|
|
SHEER WALL ###-#### DAVID nailing on sheet rock in dressing room 10/23/2001 10:57:14 AM
|
BLD-Framing/Rough-in | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PART |
Russ Owen
|
|
|
###-####. has some straping to do at front soffit. 10/19/2001 3:54:17 PM
|
BLD-Framing/Rough-in | 10/16/2001 | 10/17/2001 | 10/17/2001 | P | PART |
Russ Owen
|
|
|
###-#### DAVE. waiting for change in design for soffit and tall wall,as engineering was attached to the plans,rear wall in exit corridor has not been constructed. 10/17/2001 1:49:05 PM
|
BLD-Framing/Rough-in | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 10/15/2001 3:30:18 PM changing room. 10/15/2001 3:35:12 PM
|
FIRE-Conference | 10/12/2001 | 10/15/2001 | 10/15/2001 | A | DONE |
Troy Cobbley
|
|
|
David Fox, ###-#### or ###-####. I spoke with contractor on what I needed to see. 10/15/2001 12:06:22 PM
|
BLD-Framing/Rough-in | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PART |
Russ Owen
|
|
|
steel for the door\###-#### or ###-#### david. ok as per eng detail. 10/12/2001 4:41:51 PM
|
BLD-Framing/Rough-in | 10/10/2001 | 10/11/2001 | 10/11/2001 | P | PART |
Russ Owen
|
|
|
###-#### DAVID. need new egineering for all related items on plans. 10/11/2001 4:30:07 PM
|