Permit Information
Permit NumberBLD01-02357
StatusFinaled
Name TAHOE CONSTRUCTION
Site Address 4944 E STEMWOOD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a five bedroom, three and half bathroom 2582 sq. ft. two story single family dwelling (1146 sq. ft. first floor/1436 sq. ft. second floor) with a attached 811 sq. ft. two car garage and a 169 sq. ft. covered front porch. Per approved plans, engineering and requirement list. CUP98-0116 per Roger Jones with Planning and Zoning. PC#603 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/20/20023/20/20023/20/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/20/2002 at 10:29:45. Contact: ###-####. c. of c. #22173 issued. 3/20/2002 12:24:34 PM
BLD-Energy code compliance1/24/20021/25/20021/25/2002AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/24/2002 at 12:06:02. Contact: ###-####. Additional test result for Thermospray cellulose insulation does not require a poly. vapor barrier or install the vapor barrier per Boise City Energy requirements. 1/25/2002 9:52:14 AM
BLD-Energy code compliance1/25/20021/25/20021/25/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/25/2002 at 10:05:22. Contact: ###-####. ok to cover 1/25/2002 1:30:51 PM
BLD-Framing/Rough-in1/22/20021/23/20021/23/2002APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/22/2002 at 15:15:40. Contact: ###-####. c/n posted--ok to insulate 1/23/2002 9:34:04 AM
BLD-Framing/Rough-in1/22/20021/23/20021/23/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/22/2002 at 15:17:09. Contact: ###-####. Prior c/n items completed--ok to insulate. 1/23/2002 3:44:05 PM
BLD-Other1/7/20021/9/20021/9/2002AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/07/2002 at 14:30:04. Contact: ###-####. SHEAR--c/n posted on site 1/9/2002 9:13:08 AM
BLD-Other1/9/20021/9/20021/9/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/09/2002 at 09:40:43. Contact: ###-####.SHEAR--Ext. ok--interior shear is needed after ok to cover. 1/9/2002 1:30:21 PM
BLD-Foundation12/6/200112/6/200112/6/2001PPART
DetailsSteven Webb
###-#### no footing inspection--mis-communications with schedule and inspector--footing appears ok and foundation 80% completed at time of inspection. 12/6/2001 2:29:42 PM
BLD-Footing12/4/200112/4/200112/4/2001PCANC
DetailsSteven Webb
###-#### Date and time already passed by the time I received the inspection request. 12/5/2001 7:24:33 AM