BLD-Final | 11/8/2001 | 11/8/2001 | 11/8/2001 | P | PASS |
Jim Sly
|
|
|
###-#### JOHN C/C issued 11/8/2001 3:55:07 PM
|
BLD-Energy code compliance | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | PASS |
Jim Sly
|
|
|
###-#### BILL Frame OK 10/3/2001 4:28:28 PM
|
BLD-Framing/Rough-in | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | PASS |
Jim Sly
|
|
|
fr --bill ###-####
|
BLD-Framing/Rough-in | 9/30/2001 | 10/1/2001 | 10/1/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/30/2001 at 20:35:19. Contact: ###-####. C/N posted. 10/1/2001 3:54:57 PM
|
BLD-Foundation | 9/7/2001 | 9/7/2001 | 9/7/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 07:11:14. Contact: ###-####.
|
BLD-Footing | 9/6/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 05:35:38. Contact: ###-####.
|