BLD-Final | 6/11/2002 | 6/11/2002 | 6/11/2002 | P | PASS |
Steven Webb
|
|
|
###-#### lock box is 193 located garage wall to the left of front door C. of C. #22474 issued. 6/11/2002 1:41:11 PM
|
BLD-Conference | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/19/2002 3:38:09 PM w/ supt re c/n...wip.
|
BLD-Energy code compliance | 3/4/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Steven Webb
|
|
|
terry-###-#### energy code
|
BLD-Framing/Rough-in | 2/26/2002 | 2/27/2002 | 2/27/2002 | A | PASS |
Alan Hauser
|
|
|
within city limits, appears ok as per plans 2/27/2002 12:14:08 PM
|
BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Steven Webb
|
|
|
###-#### TERI SHEAR INSPECT--ok -- 1/30/2002 9:15:19 AM
|
BLD-Framing/Rough-in | 1/24/2002 | 1/25/2002 | 1/25/2002 | P | PART |
Steven Webb
|
|
|
###-#### SHEAR--Bottom floor ok--2nd floor not ready for inspection. 1/25/2002 1:22:44 PM
|
BLD-Framing/Rough-in | 1/24/2002 | 1/24/2002 | 1/24/2002 | P | CANC |
Steven Webb
|
|
|
shear nail ###-#### Cancelled by contractor via telephone. 1/24/2002 12:31:50 PM
|
BLD-Aging Inspection | 12/12/2001 | 12/12/2001 | 12/12/2001 | | PART |
Steven Webb
|
|
|
wip 12/12/2001 8:35:47 AM
|
BLD-Foundation | 10/12/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 06:48:47. Contact: ###-####. wip--Changed approved plans from 6" to 8" foundation wall where 2-story exist. Ok with pat--prestige per telephone. 10/12/2001 10:50:07 AM
|
BLD-Footing | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 08:49:51. Contact: ###-####. wip 10/10/2001 1:34:50 PM
|