BLD-Framing/Rough-in | 10/5/2001 | 10/8/2001 | 10/8/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/05/2001 at 10:46:11. Contact: ###-####. Hold down for uplift at columns installed per Eng. 10/8/2001 8:53:33 AM
|
BLD-Framing/Rough-in | 10/2/2001 | 10/3/2001 | 10/3/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 13:28:09. Contact: ###-####. Dormer room only OK....OK to cover. 10/3/2001 2:37:32 PM
|
BLD-Framing/Rough-in | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 12:59:21. Contact: ###-####. The fiber glass columns have no attachment details shown on the approved plans, for the uplift connections of top and bottom support and bearing points, of(3) 11-7/8 mico lams and concrete footings, c/n to provide connection details from the column manfacturer. 9/28/2001 11:23:46 AM
|
BLD-Framing/Rough-in | 9/11/2001 | 9/11/2001 | 9/11/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 08:25:32. Contact: ###-####. ok to cover bottom of glu lam nail in hangers ok
9/11/2001 3:53:26 AM
|