BLD-Final | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 5/30/2002 4:04:53 PM
|
BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 | P | CANC |
Jim Sly
|
|
|
SHEER ###-#### CHAD
|
BLD-Energy code compliance | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Jim Sly
|
|
|
don ###-####
|
BLD-Framing/Rough-in | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Jim Sly
|
|
|
don- ###-#### fr
|
BLD-Framing/Rough-in | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### chad C/N posted 2/20/2002 2:01:53 PM
|
BLD-Framing/Rough-in | 1/16/2002 | 1/16/2002 | 1/16/2002 | P | PART |
Jim Sly
|
|
|
###-#### ###-#### Shear OK 1/16/2002 4:09:13 PM
|
BLD-Aging Inspection | 12/11/2001 | 12/11/2001 | 12/11/2001 | | PART |
Jim Sly
|
|
|
WIP 12/11/2001 11:58:30 AM
|
BLD-Foundation | 10/10/2001 | 10/11/2001 | 10/11/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 14:02:01. Contact: .
|
BLD-Footing | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | PART |
Jim Sly
|
|
|
###-####
|