BLD-Final | 12/12/2001 | 12/13/2001 | 12/13/2001 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 12/13/2001 1:11:16 PM
|
BLD-Energy code compliance | 11/12/2001 | 11/13/2001 | 11/13/2001 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/12/2001 at 13:57:38. Contact: ###-####. 316 did insp. 11/14/2001 11:25:52 AM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | A | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 11/13/2001 9:24:04 AM energy...OK
|
BLD-Foundation | 10/3/2001 | 10/3/2001 | 10/3/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 06:24:42. Contact: ###-####.
|
BLD-Footing | 10/2/2001 | 10/2/2001 | 10/2/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 07:10:26. Contact: ###-####.
|