BLD-Final | 1/7/2002 | 1/8/2002 | 1/8/2002 | P | PASS |
Jim Sly
|
|
|
###-#### entry code 5193 C/C issued. 1/8/2002 3:16:58 PM
|
BLD-Final | 1/3/2002 | 1/4/2002 | 1/4/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### ACCESS CODE 5193 ENTER C/N on site. 1/4/2002 10:23:30 AM
|
BLD-Energy code compliance | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Jim Sly
|
|
|
###-#### ROD
|
BLD-Framing/Rough-in | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### ok to insulate 11/14/2001 1:50:57 PM
|
BLD-Framing/Rough-in | 10/30/2001 | 10/31/2001 | 10/31/2001 | A | PART |
Jim Sly
|
|
|
###-#### Shear OK. 10/31/2001 9:35:09 AM
|
BLD-Foundation | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 13:32:26. Contact: ###-####.
|
BLD-Footing | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | PART |
Jim Sly
|
|
|
ft rob ###-####
|