BLD-Final | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | FAIL |
Dave Hannah
|
|
|
###-#### access garage door opener 1225 c/n on site 2/22/2002 10:07:11 AM
|
BLD-Final | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### DAVE c.c #22011 issued 2/22/2002 3:47:48 PM
|
BLD-Framing/Rough-in | 1/2/2002 | 1/3/2002 | 1/3/2002 | A | PASS |
Jim Sly
|
|
|
###-#### SHEER WALL Int shear OK 1/3/2002 9:42:42 AM
|
BLD-Energy code compliance | 12/28/2001 | 12/31/2001 | 12/31/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/28/2001 at 11:01:26. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/28/2001 | 12/31/2001 | 12/31/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/28/2001 at 11:02:36. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/26/2001 | 12/27/2001 | 12/27/2001 | A | FAIL |
Jim Sly
|
|
|
DAVE CELL ###-#### PLEASE CALL 30 MIN BEFORE GOING OUT AS HE HAS QUE ON THE HOLD DOWNS C/N posted 12/27/2001 1:29:27 PM
|
BLD-Framing/Rough-in | 12/21/2001 | 12/24/2001 | 12/24/2001 | A | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site ext ok to cover 12/24/2001 9:54:00 AM
|
BLD-Footing | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PART |
Dave Hannah
|
|
|
BILL 8###-####
|
BLD-Foundation | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 12:57:11. Contact: ###-####. Bsmnt wall only. 10/4/2001 11:53:48 AM
|
BLD-Footing | 10/1/2001 | 10/2/2001 | 10/2/2001 | A | PART |
Jim Sly
|
|
|
###-#### BILL
|