Permit Information
Permit NumberBLD01-02555
StatusFinaled
Name PERFECT NAILS
Site Address 350 N MILWAUKEE ST Unit: 2159
Project NameBTS - #2159
Customer Number 
ePlanReviewNo
Description
**(PERFECT NAILS)**(BTS-SPACE #2159) To remodel an existing 589 sq ft retail tenant space located on the second floor of the mall. Work will include, construction of interior noncombustible partition to create an accessible restroom, new flooring, installing three new sinks, installing new exhaust fans, reusing storefront and suspended ceiling. This building is fully fire sprinklered and contains a smoke evacuation system, any alterations to the fire sprinkler system shall be per NFPA 13. The smoke evacuation system must remain operational as installed under the 1985 UBC, All areas must have an opening into the return air plenum. (pc#749-01) *RmH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/200111/1/200111/1/2001APART
DetailsRuss Owen
###-#### ok now was pending plumbing. 11/1/2001 5:08:52 PM
BLD-Final11/1/200111/1/200111/1/2001PPASS
DetailsRuss Owen
fn -dave ###-#### ok perm oc. 11/1/2001 4:06:28 PM
BLD-Final11/1/200111/1/200111/1/2001APASS
DetailsTroy Cobbley
Added by Inspector: 430 On 11/1/2001 11:57:50 AM Fire/Life Safety OK for perm occ
Permanent Occupancy 11/1/200111/1/2001 DONE
Details
BLD-Framing/Rough-in10/30/200110/30/200110/30/2001PFAIL
DetailsRuss Owen
fr insp david- ###-#### Water heater encrt 10/31/2001 12:34:36 PM oaches in h-c sink,needs fire insp ele and plm will need to re-inspect water heater when relocated. 10/31/2001 12:35:22 PM
FIRE-Final Inspection10/30/200110/30/200110/30/2001PPART
DetailsTroy Cobbley
Fire sprinkler system is OK and signed off. Smoke detector and fire damper operation on the fire alarm system needs to be tested. 10/31/2001 9:17:05 AM
BLD-Framing/Rough-in10/24/200110/25/200110/25/2001APASS
DetailsRuss Owen
fr insp dave ###-####--
FIRE-Sprinkler Rough-in10/24/200110/25/200110/25/2001PCANC
DetailsTroy Cobbley
Duplicate inspection 10/25/2001 8:26:15 AM
FIRE-Sprinkler Rough-in10/25/200110/25/200110/25/2001PCANC
DetailsTroy Cobbley
duplicate inspection 10/25/2001 2:26:49 PM
BLD-Framing/Rough-in10/23/200110/24/200110/24/2001AFAIL
DetailsDave Hannah
###-#### DAVE NEEDS TO FINISH C/N ITEMS 10/24/2001 10:55:54 AM
FIRE-Sprinkler Rough-in10/23/200110/24/200110/24/2001PPASS
DetailsTroy Cobbley
Sprinkler rough-in OK. No plans required 10/25/2001 8:20:00 AM 10/25/2001 8:20:20 AM
BLD-Framing/Rough-in10/22/200110/23/200110/23/2001AFAIL
DetailsDave Hannah
###-#### DAVID needs elec and plumbing also needs fire stopping in floor 10/23/2001 11:58:14 AM