BLD-Final | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 08:41:44. Contact: ###-####. final ok per plan. 1/22/2002 1:33:29 PM
|
Permanent Occupancy | | 1/22/2002 | 1/22/2002 | | DONE |
|
|
|
|
BLD-Final | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 15:44:54. Contact: ###-####. will recall 1/18/2002 9:00:25 AM
|
FIRE-Final Inspection | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/16/2002 at 08:49:00. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 10:40:42. Contact: ###-####...rec'd arch's letter re hdr/brg walls, ok to cover. 12/19/2001 3:43:24 PM
|
BLD-Framing/Rough-in | 12/18/2001 | 12/18/2001 | 12/18/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 10:34:16. Contact: ###-####...keep cn. 12/18/2001 3:44:46 PM
|
BLD-Framing/Rough-in | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 09:25:55. Contact: ###-####...nr, need fireblocks, hvac r/i. etc. Has stamped detail for deletion of fnd. below existing brg wall, will review & consult as I am unable to visually determine load path 11/27/2001 3:06:33 PM
|