BLD-Final | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | PASS |
Tony Young
|
|
|
john 371--2506
|
BLD-Final | 8/22/2002 | 8/23/2002 | 8/23/2002 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 23:09:20. Contact: ###-####.need trades 8/26/2002 9:55:12 AM
|
BLD-Grading Inspection | 8/23/2002 | 8/23/2002 | 8/23/2002 | | DONE |
Rita DeYoung
|
|
|
Final grading and drainage complete and approved.
|
BLD-Energy code compliance | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | PASS |
Tony Young
|
|
|
###-####- john energy code
|
BLD-Framing/Rough-in | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PART |
Carl Dependahl
|
|
|
john ###-#### fr insp ; complete shear repair at fireplace area (int. wall)
(4/2/2002 9:08:52 AM 4/2/2002 10:09:33 AM
|
BLD-Framing/Rough-in | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/1/2002 4:40:54 PM shear ok except, chk sh. wall behind f.p. add fireblocks same location, ok to insulate
|
BLD-Foundation | 12/6/2001 | 12/6/2001 | 12/6/2001 | P | PART |
Tony Young
|
|
|
###-#### LOGAN
wip, ok when ready, need to cover after 12/6/2001 2:59:16 PM
|
BLD-Footing | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 07:40:41. Contact: ###-####.
wip, verified soil letter 11/26/2001 3:54:03 PM
|