BLD-Final | 12/13/2001 | 12/14/2001 | 12/14/2001 | A | PASS |
Jim Sly
|
|
|
jeff-- ###-#### re-insp fn C/C issued. 12/14/2001 10:08:16 AM
|
BLD-Final | 12/12/2001 | 12/13/2001 | 12/13/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site 12/13/2001 2:26:19 PM
|
BLD-Energy code compliance | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 11/13/2001 1:45:30 PM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### JEFF
|
BLD-Energy code compliance | 11/8/2001 | 11/9/2001 | 11/9/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### JEFF. First c/n not done wall needs to be fured out . sheetrock would not be able to be put on this as built now, should have been a 2x6 wall. c/n posted. 11/9/2001 10:03:01 AM
|
BLD-Framing/Rough-in | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### JEFF c/n on site ok to insulate after plumbing rough in sign off 11/7/2001 1:37:33 PM
|
BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### JEFF . c/n staples needed above hds. 11/6/2001 10:18:39 AM
|
BLD-Foundation | 10/15/2001 | 10/16/2001 | 10/16/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/15/2001 at 08:50:44. Contact: ###-####. work in progress 10/16/2001 10:47:53 AM
|
BLD-Footing | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/15/2001 at 08:49:59. Contact: ###-####. work in progress setbacks ok 10/15/2001 1:11:00 PM
|