DOC - Permit Finaled | | | 11/7/2002 | | DONE |
|
|
|
post card
|
BLD-Final | 4/6/2002 | 4/8/2002 | 4/8/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/06/2002 at 08:41:06. Contact: ###-####. C/C issued. 4/8/2002 1:53:14 PM
|
BLD-Energy code compliance | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/5/2001 | 12/6/2001 | 12/6/2001 | P | FAIL |
Jim Sly
|
|
|
robert ###-####
|
BLD-Framing/Rough-in | 12/5/2001 | 12/6/2001 | 12/6/2001 | A | FAIL |
Jim Sly
|
|
|
robert ###-#### C/N posted. 12/6/2001 9:13:09 AM
|
BLD-Framing/Rough-in | 11/20/2001 | 11/26/2001 | 11/26/2001 | A | PART |
Jim Sly
|
|
|
SHEAR INSPECTION ###-#### Shear OK 11/26/2001 2:21:08 PM
|
BLD-Foundation | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | PART |
Jim Sly
|
|
|
###-#### brent Footing only........ 10/25/2001 8:21:56 AM
|
BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PART |
Jim Sly
|
|
|
###-#### robert jim please call so he can meet you there Discussed alternate shear panels ...altering approved plan. 10/15/2001 3:30:14 PM
|