BLD-Final | 1/17/2002 | 1/18/2002 | 1/18/2002 | P | PASS |
Jim Sly
|
|
|
if locked key above front door wayne- ###-#### C/C issued. C/C issued. 1/18/2002 1:03:55 PM
|
BLD-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | | PART |
Jim Sly
|
|
|
WIP Just completed Mec final today. 1/14/2002 10:02:45 AM
|
BLD-Framing/Rough-in | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Jim Sly
|
|
|
###-#### wayne Energy OK 11/14/2001 4:02:02 PM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/13/2001 at 07:38:44. Contact: ###-####. C/N..... 11/13/2001 3:35:30 PM
|
BLD-Framing/Rough-in | 11/2/2001 | 11/2/2001 | 11/2/2001 | P | PART |
Jim Sly
|
|
|
SHEER PANEL ###-#### WAYNE Shear OK. 11/5/2001 9:50:27 AM
|
BLD-Framing/Rough-in | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### wayne sheer wall C/N posted. 11/2/2001 8:42:11 AM
|
BLD-Other | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 22:45:11. Contact: ###-####. C/N...Need appr plan...OK to side all but front entry and rear dining. 10/26/2001 9:54:48 AM
|
BLD-Foundation | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 15:26:33. Contact: ###-####. work in progress 10/5/2001 12:21:05 PM
|
BLD-Footing | 10/4/2001 | 10/4/2001 | 10/4/2001 | P | PART |
Jim Sly
|
|
|
###-#### LOGAN
|