BLD-Final | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | CANC |
Steven Webb
|
|
|
Scheduled by Inspector: 408 On 2/28/2002 4:57:36 PM
|
BLD-Final | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 17:14:39. Contact: ###-####. c/n posted--mechancal final needed, elec. plates on outside wall need sealing, remove plastic from smoke det. 3/1/2002 8:39:07 AM
|
BLD-Final | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 10:57:57. Contact: ###-####. c. of c. #22160 issued. 3/1/2002 1:01:14 PM
|
BLD-Final | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 10:32:18. Contact: ###-####.
|
BLD-Energy code compliance | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 12/21/2001 1:44:23 PM ok to cover 12/21/2001 1:46:14 PM
|
BLD-Energy code compliance | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/20/2001 at 09:27:05. Contact: ###-####. Air seal not energy-- ok to insulate 12/20/2001 1:22:43 PM
|
BLD-Framing/Rough-in | 12/18/2001 | 12/19/2001 | 12/19/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 18:18:12. Contact: ###-####. structure looks ok but air seal needed. 12/19/2001 11:14:42 AM
|
BLD-Wall cover | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/28/2001 at 07:37:37. Contact: ###-####. ok to side 11/28/2001 2:12:05 PM
|
BLD-Foundation | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | PART |
Steven Webb
|
|
|
###-#### JERAD wip 10/18/2001 10:20:37 AM
|
BLD-Footing | 10/17/2001 | 10/17/2001 | 10/17/2001 | P | PART |
Steven Webb
|
|
|
###-#### JERAD wip 10/17/2001 2:41:24 PM
|