BLD-Energy code compliance | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PART |
Tony Young
|
|
|
BOB ###-####
ok to cover after trades ok 1/28/2002 3:12:17 PM
|
BLD-Energy code compliance | 1/25/2002 | 1/25/2002 | 1/25/2002 | P | NR |
Dave Hannah
|
|
|
###-#### crew pulled off still needs to insulate ceilings fire blocking around fire place 1/25/2002 2:39:06 PM
|
BLD-Framing/Rough-in | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | PASS |
Dave Hannah
|
|
|
###-#### nw half main floor ok to insulate 1/25/2002 10:39:47 AM
|
BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | PART |
Tony Young
|
|
|
###-####
ok to cover upper floor, east 1/2 of main floor, pending trades ok, // energy code ok in those areas 1/10/2002 12:53:35 PM
|
BLD-Energy code compliance | 1/2/2002 | 1/3/2002 | 1/3/2002 | A | PART |
Tony Young
|
|
|
###-####
ok to cover east main level 1/3/2002 11:43:06 AM
|
BLD-Framing/Rough-in | 12/26/2001 | 12/26/2001 | 12/26/2001 | P | PART |
Tony Young
|
|
|
###-####
framing issues on main floor/east 1/2 ok,, ok to insulate that portion 12/26/2001 12:47:13 PM
|
BLD-Framing/Rough-in | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | PART |
Tony Young
|
|
|
###-#### BOB
ext. shear nailing ok, some missing hds on inside, also some int. shear walls,, ok to insulate main floor, east 1/2, pending trades 12/21/2001 12:51:44 PM
|
BLD-Conference | 11/20/2001 | 11/26/2001 | 11/26/2001 | A | PART |
Tony Young
|
|
|
###-#### MARK
framing conf., nothing in particular 11/26/2001 11:50:22 AM
|
BLD-Footing | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | PART |
Tony Young
|
|
|
###-#### rick
3 pads, 1 ext. 2 int, wip 10/25/2001 11:52:51 AM
|
BLD-Footing | 10/16/2001 | 10/18/2001 | 10/18/2001 | P | PART |
Tony Young
|
|
|
###-#### BOB
poured, walls 10/19/2001 11:31:18 AM
|
BLD-Footing | 10/15/2001 | 10/16/2001 | 10/16/2001 | P | PART |
Tony Young
|
|
|
###-#### bob
wip, int. ftgs 10/16/2001 12:49:40 PM
|