Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02601
StatusFinaled
Name ALBERTSONS DATA CENTER
Site Address 700 N ANCESTOR PL
Project NameALBERTSONS DATA CENTER
Customer Number 
ePlanReviewNo
Description
(ALBERTSONS DATA CENTER) This building is fire sprinklered for area increase. To construct interior tenant improvements within a new 33,176 square foot office and computer data building. This tenant will occupy the entire building. Work is to include interior nonbearing walls, two restrooms accessible to the disabled, a 1-hr corridor, 2-hr walls, 1-hr walls, access floor systems, suspended ceilings, a unistrut grid suspended from roof joists, and finishes all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. PC01-0767 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/23/20028/23/20028/23/2002 DONE
Final/ok for perm. occ.
BLD-Final8/21/20028/22/20028/22/2002PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/21/2002 at 17:41:26. Contact: ###-####. Need all signatures for Perm Occ. Temp ....OK. 8/22/2002 2:41:35 PM
FIRE-Final Inspection8/20/20028/21/20028/21/2002PPASS
DetailsTroy Cobbley
fire life/safety, fire alarm and fire sprinkler finaled 8/22/2002 9:13:14 AM
FIRE-Alarm Testing8/9/20028/12/20028/12/2002AFAIL
DetailsTroy Cobbley
no approved plans on site 8/12/2002 10:55:01 AM
BLD-Footing7/26/20027/26/20027/26/2002PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 07/26/2002 at 08:22:14. Contact: ###-#### 7/26/2002 12:26:15 PM
BLD-Framing/Rough-in7/16/20027/17/20027/17/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/16/2002 at 15:47:39. Contact: ###-####.west side grid ceiling ok. 7/17/2002 11:31:00 AM
FIRE-Conference7/16/20027/17/20027/17/2002APASS
DetailsTroy Cobbley
sprinkler pipe is OK to cover in breakroom, conference room, east/west corridor and in the large open office. The small offices within the large open office need the hangers corrected 7/17/2002 1:00:32 PM
BLD-Framing/Rough-in6/28/20027/1/20027/1/2002PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/28/2002 at 17:33:33. Contact: ###-####. grid ok int walls west side ok 7/1/2002 3:12:16 PM
BLD-Framing/Rough-in6/12/20026/13/20026/13/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/12/2002 at 13:31:03. Contact: ###-####.grid. 6/13/2002 1:05:11 PM
BLD-Framing/Rough-in6/10/20026/11/20026/11/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/10/2002 at 15:46:40. Contact: ###-####.ceiling needs perimeters. 6/11/2002 4:45:17 PM
FIRE-Conference6/4/20026/6/20026/6/2002ADONE
DetailsTroy Cobbley
rough-in OK in the data room and is ok to cover. 6/6/2002 11:03:33 AM
BLD-Framing/Rough-in5/15/20025/16/20025/16/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/15/2002 at 16:33:05. Contact: ###-####.
BLD-Framing/Rough-in4/12/20024/15/20024/15/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/12/2002 at 11:03:58. Contact: ###-####.. needs ceiling grid at the data area approved by architect and grid mnf co. 4/15/2002 12:12:10 PM
BLD-Conference4/4/20024/5/20024/5/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/04/2002 at 15:23:12. Contact: ###-####.. went over ceiling grid in server area, unistrut design, appears ok as per plans. 4/5/2002 1:13:11 PM
BLD-Framing/Rough-in3/20/20023/21/20023/21/2002APART
DetailsTom Arcoraci
###-#### kent ok to cover east side full height walls 3/21/2002 9:02:37 AM
BLD-Framing/Rough-in3/20/20023/21/20023/21/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/20/2002 at 11:42:37. Contact: ###-####.