(LITTLE MORRIS)(JEFFERSON PLACE-5TH FLR) To remodel the an existing tenant space located on the fifth floor. Work to include construction of one-hour fire-rated interior partitions to create new office spaces, upgrade restrooms by replacing sinks for accessiblity upgrade requirements, Miscelaneous related interior finishes. This building is fully fire sprinklered for the additional 5th floor, Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (pc#774-01)RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/14/20037/14/20037/14/2003 DONE
DetailsCarl Dependahl
prev. finalled 7/14/2003 12:09:45 PM
BLD-Final1/14/20021/15/20021/15/2002APASS
DetailsCarl Dependahl
###-####...plbg NA'd on card existing sinks/countertop ok without replacement fot ADA compliance 1/15/2002 3:10:37 PM
FIRE-Final Inspection1/14/20021/14/20021/14/2002PPASS
DetailsRick Jackson
###-####
BLD-Final1/9/20021/9/20021/9/2002PFAIL
DetailsTom Arcoraci
###-#### needs fire to sign off 1/9/2002 3:15:28 PM
BLD-Final12/3/200112/3/200112/3/2001PPART
DetailsJim Storey
eric ###-#### temp ok need ele and pipe protection under sinks ada. 12/4/2001 9:34:10 AM
BLD-Final11/28/200111/28/200111/28/2001PFAIL
DetailsCarl Dependahl
Wants Temp only\\###-#### Eric nr, need other oks...complete ADA at restroom sinks,as needed. 11/28/2001 2:51:18 PM
BLD-Framing/Rough-in11/28/200111/28/200111/28/2001PPART
DetailsCarl Dependahl
###-#### eric... wall kickers installed...complete ext landings; wood studs ok per ch 6, UBC. (III-1) 11/28/2001 3:08:33 PM
FIRE-Final Inspection11/28/200111/28/200111/28/2001PFAIL
DetailsRick Jackson
###-#### Eric need annual sprinkler system test; extinguishers; 11/28/2001 3:44:08 PM
BLD-Framing/Rough-in11/1/200111/1/200111/1/2001PPART
DetailsRuss Owen
###-#### ERIC 5TH FLOOR. Needs electrical, and brace tops of walls and rfi from architect for wood studs /plans call for steel. Ok for type III-N. 11/1/2001 5:11:13 PM
BLD-Framing/Rough-in10/31/200110/31/200110/31/2001PCANC
DetailsRuss Owen
###-#### MIKE CALLED IN TO CANC THIS INSPECTION 10-31-01 ///DLD
BLD-Conference9/27/20019/27/20019/27/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 9/27/2001 2:51:46 PM issued SWO w/ dbl fee on 5th fl remodel