Permit Information
Permit NumberBLD01-02643
StatusFinaled
Name REPUBLIC STORAGE AT FRANKLIN
Site Address 10 N HARTMAN
Project NameREPUBLIC STORAGE PHASE I
Customer Number 
ePlanReviewNo
Description
Building 7 * (SECTION 1 of 2) A four hour area separation wall will be used to divide this building into two separate buildings. This section is 7,640 sq.ft. multi unit mini storage warehouse facility. All construction is per the approved plans and attached comment list and CABO/ANSI A117.1. Refer to BLD 01-02644 for other side of area separation wall. PC#475-01 Grading under Bld01-01548 routing under separate set of plans. MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection6/6/20026/7/20026/7/2002ANR
DetailsTroy Cobbley
secondary access still not complete 6/7/2002 1:55:50 PM
BLD-Final3/19/20023/19/20023/19/2002PPASS
DetailsTom Arcoraci
###-#### CORNELL ###-#### CORNELL ok for temp 3/19/2002 4:30:24 PM
FIRE-Final Inspection3/18/20023/18/20023/18/2002APART
DetailsTroy Cobbley
Added by Inspector: 430 On 3/18/2002 9:52:02 AM life safety given temp per Dave Miller until secondary access road is complete
FIRE-Final Inspection3/6/20023/6/20023/6/2002PFAIL
DetailsTroy Cobbley
Letter to Dave Miller required and road repaired 3/6/2002 3:53:45 PM
BLD-Framing/Rough-in2/28/20023/1/20023/1/2002APART
DetailsTom Arcoraci
###-#### wip hds 3/1/2002 10:13:50 AM
BLD-Aging Inspection1/21/20021/21/20021/21/2002 PART
DetailsTom Arcoraci
FIRE-Conference11/19/200111/20/200111/20/2001APART
DetailsTom Arcoraci
FIRE WALL BLD # 7 JIM ###-#### partial 4 hr wall insp 11/20/2001 3:17:22 PM
BLD-Footing10/29/200110/29/200110/29/2001PPASS
DetailsTom Arcoraci
###-#### STEVE