BLD-Final | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | FAIL |
Steven Webb
|
|
|
fn occ -steve ###-#### c/n rim joist required to be insulated. 3/28/2002 8:27:03 AM
|
BLD-Final | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PASS |
Steven Webb
|
|
|
###-#### steve c. of c. #22175 issued 3/28/2002 12:51:25 PM
|
BLD-Final | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | NR |
Tom Arcoraci
|
|
|
steve- ###-#### fn gar code is 0000 not even close for a final insp 3/5/2002 3:19:48 PM
|
BLD-Energy code compliance | 1/18/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Dave Hannah
|
|
|
charles ###-####
|
BLD-Framing/Rough-in | 1/18/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Dave Hannah
|
|
|
charles ###-#### fr insp all c/n items completed ok to cover 1/22/2002 9:45:27 AM
|
BLD-Framing/Rough-in | 1/16/2002 | 1/17/2002 | 1/17/2002 | P | PART |
Steven Webb
|
|
|
CHARLES ###-#### try 1/17/2002 3:44:30 PM truss details needed for review of prior c/n item. Do not cover framing. 1/17/2002 3:45:41 PM
|
BLD-Framing/Rough-in | 1/14/2002 | 1/16/2002 | 1/16/2002 | A | FAIL |
Jim Sly
|
|
|
STEVE ###-#### C/N posted 1/16/2002 10:32:16 AM
|
BLD-Framing/Rough-in | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Steven Webb
|
|
|
STEVE ###-#### SHEER NAIL-- hd retrofit and front porch ok 1/15/2002 9:35:39 AM
|
BLD-Framing/Rough-in | 1/3/2002 | 1/4/2002 | 1/4/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 17:30:09. Contact: ###-####. SHEAR c/n--ok to side except front porch soffit and southeast corner --hd retrofit needs engineering or retrofit per manufactures spec on inside. 1/4/2002 10:28:35 AM
|
BLD-Foundation | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | PART |
Dave Hannah
|
|
|
###-#### kevin work in progress 11/30/2001 4:06:59 PM
|
BLD-Footing | 11/26/2001 | 11/27/2001 | 11/27/2001 | P | PART |
Steven Webb
|
|
|
early pm ###-####wip-- 11/27/2001 1:43:14 PM
|