BLD-Final | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PASS |
Jim Sly
|
|
|
chad ###-#### fn occ C/C issued. 5/17/2002 12:29:06 PM
|
BLD-Framing/Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 | P | PASS |
Jim Sly
|
|
|
###-#### Energy OK. 2/5/2002 1:02:39 PM
|
BLD-Framing/Rough-in | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | FAIL |
Jim Sly
|
|
|
###-#### CHAD ###-#### CHAD 2/4/2002 3:41:46 PM C/N posted. 2/4/2002 3:42:01 PM
|
BLD-Framing/Rough-in | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PART |
Jim Sly
|
|
|
###-#### Shear OK 1/15/2002 11:56:08 AM
|
BLD-Framing/Rough-in | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | PART |
Jim Sly
|
|
|
###-#### Shear OK 1/14/2002 2:18:16 PM
|
BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | PASS |
Jim Sly
|
|
|
###-#### ###-####energy OK. 1/10/2002 10:30:32 AM
|
BLD-Conference | 11/21/2001 | 11/21/2001 | 11/21/2001 | P | PART |
Jim Sly
|
|
|
###-#### CHAD
|
BLD-Foundation | 10/30/2001 | 10/30/2001 | 10/30/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/30/2001 at 07:26:10. Contact: ###-####.
|
BLD-Footing | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | PART |
Jim Sly
|
|
|
###-#### ready at 10
|