Description
Brighton Plaza Office Shell & Core Building - To construct a two story,type VN, fully fire sprinklered 41,472 sq. ft. shell and core office building with site improvements. DRH01-00101 area of first floor is 20,559 sq. ft. with second floor 20,913 sq. ft. Fire sprinklers used for area increase. No occupancy is allowed under this permit. Separate plans and permits shall be required for each tenant space.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/18/20038/18/20038/18/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/18/2003 at 9:48:03 AM. Contact: ###-####.
FIRE-Final Inspection8/18/20038/18/20038/18/2003PPASS
DetailsTroy Cobbley
Fire life safety, fire alarm and fire sprinkler finaled 8/18/2003 1:27:58 PM
BLD-Conference7/29/20037/30/20037/30/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/29/2003 at 4:21:55 PM. Contact: ###-####. ADA shower. 7/30/2003 2:26:00 PM
BLD-Conference4/17/20034/17/20034/17/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/17/2003 at 8:39:44 AM. Contact: ###-####.
BLD-Framing/Rough-in2/11/20032/12/20032/12/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/11/2003 at 16:04:50. Contact: ###-####. OK to cover all soffit front entry. 2/12/2003 8:50:53 AM
BLD-Framing/Rough-in1/15/20031/16/20031/16/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 01/15/2003 at 10:24:06. Contact: ###-####. Grid at front entry (skylight) OK. 1/16/2003 11:39:49 AM
BLD-Framing/Rough-in12/12/200212/13/200212/13/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/12/2002 at 10:22:22. Contact: ###-####. Frame at corridoors, skylights, restrooms....OK. 12/13/2002 11:15:49 AM
BLD-Framing/Rough-in11/21/200211/22/200211/22/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/21/2002 at 09:49:42. Contact: ###-####. !hr isolations at skylights, under stairs, corridors (outside layer) front entry......... 11/22/2002 9:54:56 AM
BLD-Framing/Rough-in11/7/200211/8/200211/8/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/07/2002 at 13:38:49. Contact: ###-####. Framed soffits at corners OK. 11/8/2002 12:00:12 PM
BLD-Framing/Rough-in11/7/200211/8/200211/8/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/07/2002 at 13:38:49. Contact: ###-####.
BLD-Conference11/5/200211/6/200211/6/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/05/2002 at 12:43:51. Contact: ###-####. OKd 1hr rating at wall (moved) out from skylights, OKd to rock top and ceiling of rated corridor, Ply on front entry framing each side of front door, and Mech room frame....OK. 11/7/2002 11:56:42 AM
BLD-Foundation9/4/20029/5/20029/5/2002PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/04/2002 at 13:53:50. Contact: ###-####. (8) Tilt up for East side.......Pending Insp and approval (Westec). /5/2002 12:42:54 PM 9/5/2002 12:45:10 PM
BLD-Foundation8/9/20028/12/20028/12/2002PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/09/2002 at 10:13:18. Contact: ###-####. (3) Tilt up sections....Pending West tech tests and approvals. 8/12/2002 2:22:13 PM
BLD-Footing7/19/20027/19/20027/19/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/19/2002 at 08:07:53. Contact: ###-####. ok pending spec sign off 7/19/2002 1:21:30 PM
BLD-Footing7/19/20027/19/20027/19/2002PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 07/19/2002 at 08:07:53. Contact: ###-####. Footings .... S. wall, S 1/2 of W wall, S 1/2 of E. wall. Pending special insp (Westech) and approvals. 7/20/2002 12:02:05 AM
BLD-Foundation7/16/20027/17/20027/17/2002PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 07/16/2002 at 13:47:45. Contact: ###-####. OK pend special insp and appr. 7/17/2002 2:28:22 AM
BLD-Footing7/15/20027/16/20027/16/2002APART
DetailsTom Arcoraci
###-#### spec insp 7/16/2002 10:32:15 AM
BLD-Footing7/15/20027/15/20027/15/2002PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/15/2002 at 10:28:55. Contact: ###-####. subject to s-i. 7/15/2002 4:57:42 PM
BLD-Footing7/11/20027/12/20027/12/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/11/2002 at 15:53:10. Contact: ###-####.interior footings ok. 7/12/2002 5:02:15 PM